Saturday, 26 March 2016
Hook Man Shoot
This was such a problematic shoot. Firstly we did not have enough lighting, we took some small LEDs and a cool light with a generator, however the generator for the cool light started beeping so early in the shoot the director made the call to film without it. I then had to light the rest of the shoot with a couple of LED's and the interior car lights which did not work too well and this means I am slightly disappointed in the footage we produced in the end. We also had to relocated mid shoot because of problems with people interrupting the shots and causing disruptions. After moving all the equipment and crew we realized that we had lost the fake blood and had to miss that shot for it to be taken another day. In the end we did get most of the footage that we needed but it was a very chaotic shoot to say the least.
Labels:
Live Project 2
Subscribe to:
Post Comments (Atom)



No comments:
Post a Comment